Construction Calculator Pakistan: 2026 House Building Rates

Calculate instant per-square-foot building estimates for grey structure and luxury turnkey homes in Lahore, Faisalabad, and Punjab using Pakistan’s most accurate interactive construction calculator.

Grey Structure
PKR 2,915/sq ft
Civil shell, steel, bricks & slabs
Executive Turnkey
PKR 5,280/sq ft
Complete key in hand finishing
A+ Luxury Turnkey
PKR 6,820/sq ft
Premium imported finishes
Calculated Construction Budget
PKR 5.95 Million
5 Marla • Grey Structure • Lahore (DHA)
Chat with Lead Engineer on WhatsApp
PK Civil Works • Instant Estimate

Your Estimate is Ready!

Enter your contact details below to reveal your complete calculation and receive the itemized BOQ.

🔒 Guaranteed privacy. Connect directly with licensed civil engineers.
✓ Official Construction Estimate
PKR 5.95 Million

2026 Construction Material Price Index (Punjab Market)

All calculations in our engine are calibrated against current wholesale procurement rates in Lahore and Faisalabad as of September 2026. Material rates vary slightly based on brand tier and freight distances.

Material / Service Item Standard Specification Current Wholesale Rate (PKR) Recommended Brands
Deformed Steel Rebar Grade-60 (ASTM A615) PKR 255 – 275 per kg Mughal Steel, Amreli, Ittefaq
Class-A Cement Ordinary Portland Cement (50kg bag) PKR 1,350 – 1,450 per bag Bestway, Maple Leaf, Fauji, DG
Red Clay Bricks (Eent) Class-A Kiln (*Awwal*) PKR 13,500 – 15,000 per 1,000 bricks Certified local Bhattas
Coarse Aggregates (Crush) Margalla / Sargodha crushed stone PKR 115 – 145 per cu. ft. Margalla (DHA/Bahria), Sargodha (Faisalabad)
Sand (Reti) Chenab / Ravi river sand PKR 45 – 75 per cu. ft. Chenab (Concrete/Plaster), Ravi (Brickwork)
Skilled Labour Contract Grey structure execution PKR 460 – 520 per sq. ft. PK Civil Works Certified Teams

Construction Cost Benchmarks: 5 Marla, 10 Marla & 1 Kanal

Below are typical baseline parameters for double-story residential dwellings designed under LDA, FDA, and DHA building bylaws:

5 Marla House (25×45)

Covered: ~2,000 Sq Ft

  • Grey Structure: PKR 4.9M – 5.5M
  • Turnkey Complete: PKR 8.8M – 10.5M
  • Steel Requirement: ~7.5 Metric Tons
  • Bricks Count: ~52,000 Bricks
10 Marla House (35×65)

Covered: ~3,200 Sq Ft

  • Grey Structure: PKR 7.9M – 8.8M
  • Turnkey Complete: PKR 14.5M – 17.5M
  • Steel Requirement: ~12.5 Metric Tons
  • Bricks Count: ~85,000 Bricks
1 Kanal House (50×90)

Covered: ~5,400 Sq Ft

  • Grey Structure: PKR 13.5M – 15.2M
  • Turnkey Complete: PKR 24.5M – 29.5M
  • Steel Requirement: ~21.5 Metric Tons
  • Bricks Count: ~145,000 Bricks

Quick Reference: 2026 House Construction Cost in Pakistan

Need quick baseline numbers without clicking through inputs? Here is the current 2026 market cost summary for standard covered areas across Punjab:

Plot Category Typical Covered Area Grey Structure Range Executive Turnkey Range
5 Marla Double Storey 1,900 – 2,100 sq ft Rs. 5.3M – Rs. 6.5M Rs. 13.0M – Rs. 15.5M
10 Marla Luxury Villa 3,200 – 3,500 sq ft Rs. 8.8M – Rs. 10.8M Rs. 22.0M – Rs. 26.0M
1 Kanal Executive Mansion 5,200 – 5,800 sq ft Rs. 14.5M – Rs. 18.0M Rs. 36.0M – Rs. 44.5M

*Rates reflect Grade-60 steel, branded cement, Chenab river sand, and premium porcelain tiles. For custom structural drawings and itemized BOQs, consult our turnkey engineering team.

Frequently Asked Questions About House Construction Costs in Pakistan

What is the cost of building a 5 Marla house in Pakistan in 2026?

In 2026, constructing a double-story 5 Marla house (approx 1,950 to 2,100 sq ft covered area) costs between PKR 4.9 Million to PKR 5.5 Million for grey structure, and between PKR 8.8 Million to PKR 10.5 Million for turnkey completion with A-grade tiles, kitchen woodwork, and sanitary fittings.

How much steel and cement are required for a 10 Marla house?

A standard 10 Marla double-story house (3,200 sq ft covered area) requires approximately 12 to 13 metric tons of Grade-60 deformed steel and approximately 1,350 to 1,450 bags of OPC cement, alongside 80,000 to 88,000 Class-A red clay bricks.

Why does construction cost vary between Lahore and Faisalabad?

Lahore projects (specifically DHA and Bahria Town) typically utilize Margalla crushed stone and incur higher municipal NOC/approval fees alongside stricter setback bylaws. Faisalabad projects typically utilize Sargodha crushed stone, which has lower transport freight, resulting in a 3% to 5% material cost efficiency on raw aggregates.

What is included in a Grey Structure construction contract?

A professional grey structure contract with PK Civil Works includes soil excavation, anti-termite chemical spray, PCC foundation casting, Grade-60 steel reinforced columns/lintels, Awwal brick masonry, double-coat plaster, underground water tank, roof slab casting with water-proofing, and rough conduit plumbing and electrical piping.

How does PK Civil Works protect clients from material price inflation?

We sign legally binding BOQ contracts with fixed per-square-foot milestones. By utilizing our wholesale warehouses and bulk-purchasing steel and cement upfront upon signing, we hedge our clients against mid-project market escalations.

Need a Verified Structural BOQ for Your Plot?